Demolition Narrative for 1/8/2019

An update on the construction progress for the Old Library 1/08/2019.

Demolition continues from the western side of the old library. As you can see the following photos show wetting down before construction begins, at the end of the day, as well as during demolition. Also shown are the trucks being washed down before leaving the site. All of these tasks are standard operating procedure for Gorick Construction.

All air monitors continue to run properly and to date no exceedances have been noted.

Wetting of building prior to demolition - 1/7/2019 10:02am

Wetting of building prior to demolition - 1/7/2019 10:02am

Wetting of debris while being loaded into the truck (front), wetting of building during demolition (back) - 1/7/2019 10:35am

Wetting of debris while being loaded into the truck (front), wetting of building during demolition (back) - 1/7/2019 10:35am

Trucks washed down prior to leaving construction site -1/7/2019 10:52am

Trucks washed down prior to leaving construction site -1/7/2019 10:52am

Wetting down after construction ends for the day before debris are covered - 1/4/2019 4:09pm

Wetting down after construction ends for the day before debris are covered - 1/4/2019 4:09pm

Please continue to check the www.libraryplaceconstruction.com website for updates.  